the Andes and Lago Argentino at dawn, seen across the Patagonian steppeIllustrative rendering

Confidential · Planning estimates

Sovereign AI Infrastructure · Patagonia Green Data Center

Private, attested AI inference on 100% renewable energy.

Own land · Own power · Defensible moat

El Calafate, Santa Cruz, Argentina · 30,000 ha · Sovereign · Renewable · Independent

  • $40–90Kper node / month
  • 75–85%gross margin
  • $3–5KOPEX / node (own DC)
  • 100%renewable on-site
  • 10→50 MWscalable IT load
  • 30,000 haown land, Patagonia

The land today

30,000 ha of Patagonian steppe, between the Andes and the lakes

The site lies near El Calafate in the province of Santa Cruz: open steppe, steady westerly winds, cold dry air and vast space. Today it is estancia land. It is exactly this landscape that makes a sovereign, 100%-renewable AI campus possible.

The Río Chubut winding through the arid Patagonian plateauIllustrative rendering

Rivers through the steppe

Patagonian rivers such as the Río Chubut cut through layered cliffs and dry grassland: the typical character of the region's high plateaus.

Wind-swept Patagonian steppe with coirón grass and an estancia road to the horizonIllustrative rendering

Wind across the steppe

Steady westerly winds sweep the open plateau: the basis for 18 MW of wind in Phase 1, with a capacity factor of ~45%.

A glacier front meeting a turquoise glacial lake near El CalafateIllustrative rendering

Glaciers and lakes near El Calafate

Ice fields and glacier lakes define the climate: 7–12 °C year-round, the basis for free ambient cooling.

A Patagonian estancia on a vast open plain with the Andes behindIllustrative rendering

Estancia land, 30,000 ha

Own land, today an estancia: room for a 50 MW IT campus, 140 MW wind + solar, 4,000 nodes and an own substation. Dual use: estancia operations continue.

  • 7–12 °Cyear-round ambient temperature
  • ~45%wind capacity factor
  • $0land cost in our P&L
  • 0lease or eviction risk
Aerial view of the planned campus: low-profile data halls, solar farm, wind turbines, battery storage and substation in the steppe
Illustrative rendering

Before · Future vision

From open steppe to sovereign AI campus

Vision: the campus from the air. Data halls in modular 5 MW blocks, solar farm, wind turbines, battery storage and own substation, sized to own demand.

Drag the slider: the same view today and after full build-out. Data halls in modular 5 MW blocks, wind turbines, solar field, battery storage and an own 132 kV substation, sized to our own demand, with no export.

the same view with data halls, wind turbines, solar field, battery storage and substation
the site today, open steppe with lake and Andes
TodayFull build · 50 MW IT Illustrative rendering

↔ Drag to compare

  • Data halls10→50 MW IT in modular 5 MW blocks · 4,000 nodes at full build
  • Wind + solar28 MW in Phase 1, 140 MW at full build
  • Battery storage50 MWh LFP in Phase 1, 250 MWh at full build
  • SubstationOwn 132 kV substation, sized for 50 MW · grid backup tie
the campus at night under the Patagonian skyIllustrative rendering
Vision: the campus at night. No diesel backup; BESS + grid tie as buffer.

The problem

Regulated enterprises can't use AI safely

$40B+ annual spend on AI infrastructure, yet regulated buyers are locked out of the best models.

$12B

Banks & insurance

annual AI budget · <5% deployed safely

Cannot send customer data to OpenAI, Anthropic or any Chinese API. Cannot run AI on core workloads. Competitive disadvantage grows monthly.

$8B

Healthcare & pharma

annual AI budget · compliance paralysis

Patient data regulated under HIPAA, GDPR and local law. Even running a benchmark on real data is illegal without verified isolation.

$6B

Legal, government & defence

annual AI budget · mostly stalled

Sovereign data requirements. Foreign jurisdiction = disqualification. Existing private cloud is expensive and not AI-native.

$14B+

EU / LATAM / UAE enterprises

annual AI budget · fastest-growing

Data sovereignty laws tightening fast. Need verified proof, not contractual promises, that data never leaves the jurisdiction.

The gap: open-weight models (DeepSeek, GLM) are 10–30× cheaper than GPT-4, but no one offers cryptographically verified private serving at enterprise scale on own infrastructure.

The solution

Private AI inference you can prove

We run the most capable open-weight AI models inside cryptographic envelopes, on our own green infrastructure, in your jurisdiction.

01

Confidential serving

GLM-5.2 & DeepSeek V4 inside hardware TEEs. Every inference cryptographically attested. Customer data never leaves the enclave: provably, not contractually.

→ Sells to regulated buyers others cannot touch

02

Parity evaluation

Sealed-box benchmark: prove an open model matches GPT-4 on your real workload, without data leaving the jurisdiction. The only way regulated buyers can legally test.

→ Sales wedge: turns “we'd love to but can't” into signed deals

03

Sovereign deployment

Dedicated instance per enterprise. Required jurisdiction. Full SLA. Migration tooling. The rented-cloud alternative costs 4–5× more per node.

→ $40–90K/month · 75–85% gross margin

Pricing: $40–90K/node/month sovereign · $5–15K/month confidential serving · $2–8K per parity eval · 75–85% gross margin on own infrastructure vs. 45–65% rented

The Bloovian moat

Six layers that compound

Each layer is defensible alone; together they are near-impossible to replicate in under 24 months at our cost structure.

1

Asset

Own land: 30,000 ha

Zero lease, zero eviction risk. Room for a 50 MW IT campus, 140 MW wind + solar, 4,000 nodes and an own substation. Competitors pay $15–22M/yr in DC leases per 10 MW.

  • $0 land cost in our P&L
  • 12–18 months to replicate
2

Cost

Own renewable energy

Phase 1: 28 MW wind + solar + 50 MWh BESS sized to 10 MW IT; scales to 50 MW IT. Own 132 kV substation, 100% own use. Structural, not a temporary discount.

  • $0.045–0.06/kWh vs $0.10–0.18
  • $3–5K node OPEX vs $15–22K
3

OPEX

Free ambient cooling

7–12 °C year-round. PUE < 1.15 without liquid cooling. Competitors spend 20–35% of power on HVAC; our cooling cost is effectively zero.

  • PUE < 1.15 · $0 HVAC
  • Energy/node $500–800 vs $1.5–2.5K
4

Regulatory

Sovereign jurisdiction

Santa Cruz, Argentina. No US/EU extraterritorial reach, no CLOUD Act, no forced disclosure. The credible LATAM-sovereign option; valid for EU/UAE data-residency buyers.

  • Only sovereign AI DC in LATAM
  • EU/UAE/LATAM residency compliant
5

Technical

TEE + attestation stack

H200 Confidential Compute + Intel TDX / AMD SEV-SNP + our per-request attestation chain. 12–18 months to build right. Others give contracts; we give mathematical proof.

  • 18–24 month head start
  • Only 5–10% overhead
6

Timing

First mover in the region

No comparable sovereign AI DC in South America. SENASA + CAMMESA approvals, grid study, provincial permits: 12–18 months of lead time we already own.

  • Only player in South America
  • Regulatory relationships active

Copycat cost + timeline: land ($3M+) + permits (18 mo.) + 28 MW energy park ($47–63M) + 10 MW DC ($70–90M) + TEE engineering (12 mo.) = $130–160M (excl. GPUs) and 24–30 months before the first node is online.

Wind turbines and a solar park on open Patagonian grassland
Illustrative rendering

Energy plant

Sized to our own demand, built in phases

Phase 1 energy CAPEX $47–63M · ~86 GWh/yr = DC demand (10 MW IT × PUE 1.15) · no export, no surplus sale · ×5 to 50 MW IT

Phase 1: 3 × 6 MW wind turbines and 10 MW solar PV on own land.

Solar PV

10 MW

$6–8M

~17,000 panels · ~15 GWh/yr · ~20 ha own land · 9–12 months build

Wind

18 MW

$23–29M

3 × 6 MW turbines · ~71 GWh/yr · CF ~45% · 15–18 months build

BESS

50 MWh

$10–14M

LFP · 4 h at 12.5 MW · firms wind/solar to the 24/7 DC load

Infrastructure

132 kV

$8–12M

Substation sized for 50 MW · grid backup tie · SCADA · EPC

Battery storage containers next to a 132 kV substation in the steppeIllustrative rendering
50 MWh LFP battery storage and own 132 kV substation beside the data halls.

Build-out in phases

PhaseEnergy plantDC nodesEnergy CAPEXNode OPEX/moOwn use / yr
Phase 128 MW + 50 MWh800 (10 MW IT)$47–63M$3–5K~86 GWh
Phase 256 MW + 100 MWh1,600 (20 MW IT)$87–114M cumul.$3–5K~171 GWh
Phase 398 MW + 175 MWh2,800 (35 MW IT)$146–190M cumul.$3–5K~300 GWh
Full build140 MW + 250 MWh4,000 (50 MW IT)$205–266M cumul.$3–5K~428 GWh

The energy advantage: a cost moat, not the main story

Own energy is the margin engine behind 75–85% gross margin: it makes the product possible, it is not the product.

Gross margin at $50K/node
Bloovian~82%
Rented GPU~58%
Rented cloud~52%
Cost driverOwn green DC (Bloovian)Rented cloud (AWS/Azure)Rented GPU (CoreWeave)
Power cost$0.045–0.06/kWh$0.10–0.15/kWh$0.10–0.18/kWh
Cooling overhead~0% (free ambient)20–35% of power budget20–35% of power budget
PUE< 1.151.4–1.6 typical1.3–1.5 typical
DC lease cost$0 (own land)$150–400/sqft/yrEmbedded in rack rate
Node OPEX / month$3–5K$18–25K$15–22K
Gross margin at $50K/node~82%~52%~58%
Energy supply100% own, sized to demandGrid mixGrid mix

Result: own power + free cooling bring the all-in energy cost per node to ~$500–800/month vs $1.5–2.5K at a standard DC.

A data hall aisle lined with GPU server racks
Illustrative rendering

Inside the data center

The integration is the moat

Not a collection of open-source components: the integrated stack creates the value.

Data halls 800 GPU nodes (~6,400 GPUs) on 10 MW IT in Phase 1; 4,000 nodes (~32,000 GPUs) at full build. 12.5 kW IT per 8-GPU node.

  1. Model layer

    GLM-5.2 (744B MoE, 40B active, MIT) · DeepSeek V4 · model-agnostic serving

    Open weight = no API dependency, 28× cheaper than GPT-4, licence allows commercial serving; switch models in weeks.

  2. Attestation layer

    Per-request cryptographic proof · remote attestation chain · customer-verifiable logs

    Competitors offer contracts. We offer math. For regulated buyers that is the requirement.

  3. Hardware layer

    H200 SXM in Confidential Compute mode · TEE-enabled tensor parallel · NVLink isolation

    CC-mode H200 ≠ standard H200. Specialist setup, 18-month head start, node OPEX $3–5K/mo.

  4. Infrastructure layer

    Own substation · own fibre · own cooling · air-gapped mgmt plane · zero DC dependency

    CoreWeave, Lambda, Together all rent DCs. We own ours: no eviction, no lease hike, no landlord SLA.

  5. Energy layer

    28→140 MW hybrid plant (wind + solar + BESS) · SCADA · sized to own load, no export

    $0.045–0.06/kWh vs $0.10–0.15 for any DC in the EU/US. A permanent structural advantage.

Common investor Q&A

Why not just rent GPUs?

Rented = 45–65% gross margin; own infra = 75–85%. At 10 MW (800 nodes) that is ~$50M/yr. Renting also removes sovereignty and ESG.

Why not the EU or Switzerland?

Power costs $0.10–0.20/kWh in Europe vs $0.045–0.06 own firmed generation here. Structural, not cyclical. Land cost is $0.

What if DeepSeek goes closed-source?

Attestation and infrastructure are model-agnostic. Value is in enclave + jurisdiction + energy cost; we switch models in weeks.

Competitive landscape

Strong players, and a white space none of them address

↔ Scroll sideways to see all columns

CoreWeaveNebiusLambda LabsTogether AICrusoe EnergyPhala (TEE)Bloovian
GPU infrastructure✓✓✓✓✓✓✓
Open-weight modelsPartialPartialPartial✓—✓✓
Hardware TEE / attestation—————✓ (limited)✓ Full stack
Sovereign jurisdiction—EU only————✓ LATAM/EU/UAE
Own renewable energy————Partial—✓ 100% own-site
Own land / zero lease————Partial—✓ 30,000 ha
LATAM / South America——————✓ Only player
Est. revenue / funding$1B+ ARR$200M+$60M+$300M+$80M+~$3M revPhase 1: 10 MW
Node OPEX / month$18–25K$15–20K$12–18K$10–15K$14–20K$10–18K$3–5K
Gross margin (own infra)45–55%50–60%45–55%50–60%55–65%40–55%75–85%

White space: no competitor offers cryptographically attested, sovereign, 100%-renewable AI inference with own land and own power in LATAM, or anywhere at our cost structure.

Business model

Three SKUs, one platform

Revenue = price × customers × utilisation · 75–85% gross margin on own infrastructure

1

Sovereign managed deployment

$40–90K / node / month

Regulated enterprises: banks, healthcare, legal, defence, government

→ 80 nodes × $50K × 80% util. = $38.4M ARR at Phase 1

GM 75–85% · 4–8 nodes per customer · 12–24 month contracts

2

Confidential serving API

$0.008–0.025 / 1K tokens + $5–15K/mo SLA

Dev platforms, agents, compliance-sensitive SaaS migrating from closed models

→ 720 nodes (API + reserved) ≈ $126.7M ARR at Phase 1

GM 65–75% · OpenRouter listing → instant discovery

3

Parity evaluation

$2–8K per run or $15–25K/mo retainer

Enterprises evaluating open-model migration, incl. regulated buyers

→ 33 evals/month × $5K ≈ $2.0M ARR

GM 80–90% · funnel: eval converts to sovereign deployment

ARR build-up, base scenario ($M, run-rate at phase completion)
  • Reserved capacity (60%)
  • Confidential API (30%)
  • Sovereign (10%)
  • Parity evaluations
ARR build-up, base scenario ($M, run-rate at phase completion)0200400600800$167.1MPhase 1 · 10 MW$333.3MPhase 2 · 20 MW$582.9MPhase 3 · 35 MW$833.6MFull · 50 MW
Show as table
$MPhase 1 · 10 MWPhase 2 · 20 MWPhase 3 · 35 MWFull · 50 MW
Reserved capacity (60%)80.6161.3282.2403.2
Confidential API (30%)46.192.2161.3230.4
Sovereign (10%)38.476.8134.4192.0
Parity evaluations2.03.05.08.0
Total ARR$167.1M$333.3M$582.9M$833.6M

Derivation: run-rate at phase completion; 12.5 kW IT per 8-GPU node. Sovereign = $50K × 80% util.; API ≈ $20K × 80%; reserved (2–3 yr contracts) ≈ $17.5K × 80%. No power-export revenue: energy is 100% own use.

Financial model

5-year P&L and free cash flow

Build-out 10 → 50 MW IT by Year 5 · EBITDA positive from first nodes · ~70% of CAPEX debt/GPU-financed · FCF positive in Year 5

P&L / FCF, base scenarioYear 2 · Phase 1
10 MW · 800 nodes
Year 3 · Phase 2
20 MW · 1,600 nodes
Year 4 · Phase 3
35 MW · 2,800 nodes
Year 5 · Full
50 MW · 4,000 nodes
Revenue (fiscal year)$125.8M$250.7M$459.1M$709.8M
– Node OPEX (power, cooling, maint.)–$28.8M–$57.6M–$105.6M–$163.2M
– Energy plant OPEX (2%/yr)–$1.1M–$2.0M–$3.4M–$4.7M
– People (all-in, incl. CFO/BD)–$12.0M–$20.0M–$30.0M–$40.0M
– GTM, legal, audit, overhead–$6.5M–$11.5M–$19.9M–$29.9M
EBITDA (margin)$77.4M (62%)$159.6M (64%)$300.3M (65%)$472.0M (66%)
– CAPEX depreciation–$75.3M–$150.1M–$262.2M–$374.4M
EBIT (margin)$2.1M (2%)$9.5M (4%)$38.0M (8%)$97.6M (14%)
– Energy park + DC facility CAPEX–$67.5M–$125.0M–$187.5M–$187.5M
– IT / GPU CAPEX (cash out)–$168.0M–$336.0M–$504.0M–$504.0M
+ Debt / GPU financing (70%, net of debt service)+$121.5M+$238.3M+$324.1M+$222.3M
Free cash flow (net)~–$37M~–$63M~–$67M~+$3M
Cumulative FCF (incl. Yr 1)~–$106M~–$170M~–$237M~–$234M

Basis: revenue on average nodes online; blended $17.2K effective/node/mo. Yr 1 = build year (~$21M revenue, ~–$70M FCF, in cumulative). OPEX $4K/node/mo. Depreciation: energy 20 yr, DC 15 yr, GPUs 5 yr. 70% of CAPEX debt-financed at 8%. Token upside excluded. No taxes.

Valuation: key metrics and equity value

Valued on year-end run-rate · equity value = enterprise value minus net debt from the financing plan

  • Yr 1EBITDA positive
  • Yr 2EBIT positive
  • ~$240Mcumulative equity need
  • $0.83BARR run-rate, Year 5
Valuation metricYear 2
10 MW · IPO readiness
Year 3
20 MW · listing / exit
Year 5
50 MW · full scale
ARR run-rate (4–6×)$0.67–1.0B$1.3–2.0B$3.3–5.0B
EBITDA run-rate (10–15×)$1.1–1.6B$2.2–3.3B$5.6–8.4B
Less net debt–$0.3B–$0.6B–$1.3B
Target equity value~$0.5–1.0B$1–2B$2.5–5B+

Multiples: 4–6× ARR and 10–15× EBITDA (listed AI-infrastructure peers). Net debt from the 70% debt/GPU-financing plan. Planning estimates, not a forecast.

Traction & pipeline

First revenue is the only gate that matters

Phase 0 target: 2 design partners + anchor contracts for ≥30% of the 10 MW Phase 1 before any energy/DC CAPEX

Design partner

LOI in negotiation

Regulated bank (LATAM)

AI compliance team identified. Needs parity eval + sovereign deployment. Pre-approved budget $45K/month.

Design partner

Demo scheduled

Healthcare group (EU-regulated, LATAM ops)

HIPAA + GDPR + local law. No current AI solution. Shortlisted as one of 3 vendors.

Pipeline

Tender qualification

Government agency (LATAM sovereign mandate)

Explicit sovereign-AI mandate from the ministry. Own jurisdiction required by tender spec. Budget confirmed.

Pipeline

Commercial proposal

AI agent platform (EU compliance SaaS)

Migrating from OpenAI. Data residency requirement. $8K/month parity eval → $60K/month sovereign.

StageTarget (Phase 1)ConversionARR per customer
Parity evaluation20 / quarter→ 40% to sovereign$50–100K/yr
Design partner → pilot2 in Phase 0→ 80% renew to full$540K–$1.08M/yr
Sovereign deployment10–20 customers, Phase 1→ 24-month lock-in$480K–$1.08M/yr
Platform API10–20, Phase 2→ volume ramp$150–400K/yr

Gate: energy/DC CAPEX starts only when anchor contracts cover ≥30% of Phase 1 (~250 nodes). If not reached, total spend is ~$4–6M: a capped option to test the thesis.

Roadmap

Gated, capital-efficient, realistic

Every phase is gated · energy CAPEX starts only after commercial proof · the IPO is optional acceleration, not a prerequisite

  1. Phase 0

    Foundation · 6–9 months

    $4–6M

    • Site survey + wind mast installed
    • EIA filed; SENASA/CAMMESA permit applications
    • TEE stack: H200 CC mode + attestation chain
    • Confidential GLM/DeepSeek live on OpenRouter
    • 2 design partners + anchor LOIs (≥30% of 10 MW)
    • Token legal structure (separate entity)
    • Energy + DC EPC tenders · GPU allocation

    ✓ Gate: Anchors ≥30% of 10 MW · financing term sheets · no CAPEX before this gate

  2. Phase 1

    Build 10 MW · Yr 1–2

    $0.45–0.57B

    • 28 MW wind/solar + 50 MWh BESS commissioned
    • Own 132 kV substation · first 5 MW online
    • 800 GPU nodes (~6,400 GPUs) live on 10 MW IT
    • 10–20 sovereign customers + reserved anchors
    • Parity pipeline converting (20/quarter)
    • Project debt + GPU facility closed (~70%)
    • CFO: 2-year GAAP financials in preparation

    ✓ Gate: EBITDA positive · ≥$150M ARR run-rate · 10 MW on own green power

  3. Phase 2

    Scale to 20 MW · Yr 3

    $0.45–0.5B

    • Token TGE + DEX listing (separate entity)
    • 20 MW IT · 1,600 nodes incl. token-funded operators
    • ~$330M ARR run-rate milestone
    • Growth equity + infra-fund co-investment
    • 2-year GAAP audit · underwriter engaged
    • NASDAQ S-1 preparation begins
    • Energy park 56 MW + 100 MWh · carbon pilot

    ✓ Gate: ~$330M ARR · 20 MW live · audited financials · S-1 in progress

  4. Phase 3+

    35→50 MW · Yr 4–5

    $1.4B (IPO + debt)

    • NASDAQ/NYSE IPO or strategic acquisition
    • 35→50 MW IT funded by IPO, debt or acquirer
    • 4,000 nodes (~32,000 GPUs): full AI campus
    • Strategic buyers: NVIDIA, Oracle, AWS, Google, Microsoft
    • $800M+ ARR run-rate
    • Carbon credit programme
    • CEX listings for the token

    ✓ Gate: Market conditions permitting · profitable standalone at any phase

Investment

What we are raising

Phase-gated · equity ~30%, debt/GPU financing ~70% · the minimum viable raise reaches anchor contracts before any CAPEX

1st close

Phase 0 seed

$4–6M

Site survey, wind measurement, permits, grid study, TEE stack, 2 design partners + anchor LOIs, token legal. Walk-away option: if anchors don't sign, we stop.

2nd close

Phase 1 equity

$140–170M

Equity tranche of the $0.45–0.57B Phase 1 (10 MW IT · 800 nodes · 28 MW energy park). Triggered only after anchors ≥30%; the rest via project debt + GPU financing.

Parallel

Hardware in-kind

50–250 nodes

TEE-capable, CC-enabled; ~$420K each all-in = $20–105M capex value. Operators join via token rewards or revenue share. Reduces equity need 1:1.

Parallel

Energy co-invest

$47–63M

Direct stake in the 28 MW wind/solar + 50 MWh BESS plant via a 20-yr internal PPA with the DC. Hard asset, scales to 140 MW. Target levered IRR 12–15%.

Use of funds, Phase 1 ($0.45–0.57B, all sources)
GPU nodes (800 × 8-GPU)66% $305–370M
DC facility (10 MW IT)16% $70–90M
Energy park (28 MW + BESS)11% $47–63M
Reserve / contingency4% $15–25M
People, GTM, legal, audit3% $15–20M

Strongest investor position: Phase 0 seed ($5M) now + Phase 1 equity ($140–170M) conditional on anchor contracts + energy co-invest ($47–63M) + optional hardware nodes.

Exit options

An IPO readiness programme, with several routes to value

Valuable to several acquirer categories; the form depends on market conditions at the time.

NASDAQ / NYSE listing

Year 3–4 · 20–35 MW

$1–2B at listing

≥$330M ARR run-rate · 20 MW live · 2 yrs GAAP · underwriter engaged

Comparables: Core Scientific (CORZ $2.5B), Applied Digital (APLD $600M), Iris Energy (IREN $1.1B). Green AI infra earns an ESG premium of 30–50% vs non-green peers.

Strategic acquisition

Year 2–4 · any phase

$0.5–2B

≥$150M ARR + 10 MW live + own energy asset

NVIDIA (AI infra), Oracle (sovereign cloud LATAM), AWS/Google/Microsoft (LATAM DC gap), Aramco/ADNOC (sovereign AI). Energy + land + jurisdiction is what hyperscalers can't buy fast.

Infrastructure fund / PE

Year 3+ · Phase 2+

$0.4–1B

Stable EBITDA · long-term energy asset · contracted AI revenues

Brookfield, Macquarie, KKR Infrastructure value predictable cash flow + hard assets: renewable plant + contracted AI revenue + sovereign DC.

Token liquidity

Separate, parallel · Phase 2+

Upside, not modelled

Token TGE · CEX listing

Equity investors hold Bloovian Inc. shares; token holders are separate. Legally and economically separate: no cross-contamination of returns or regulation.

ESG

Three pillars, no noise

Focused on what is real, measurable and investor-relevant · no speculative future programmes

E

100% renewable, day one

  • Own 28 MW wind + solar + BESS on own land, not purchased offsets
  • Net-zero Scope 2 from day one of operations
  • PUE < 1.15 with free ambient cooling, no water use
  • Generation sized to own demand, no export
  • Every phase to 50 MW IT (140 MW gen.) 100% renewable
  • No diesel backup: BESS + grid tie as buffer

CO₂ Scope 2: net zero · PUE < 1.15 · water use: zero

S

Regional economic value

  • 80+ direct jobs at 10 MW, 200+ at 50 MW (El Calafate)
  • Training partnerships with Argentine universities
  • Dual-use land: estancia operations + data center
  • Local procurement for construction and operations
  • SENASA + provincial regulatory alignment
  • First sovereign AI campus in LATAM

80–200+ jobs · 30,000 ha dual-use · local supply chain

G

Governance built for institutions

  • Independent entity, no corporate parent dependency
  • Cryptographic attestation: auditable by design
  • GAAP/IFRS audited financials from Phase 1
  • Quarterly, transparent investor reporting
  • Phase gates + walk-away criteria pre-published in the SHA
  • IPO-ready board: 3+ independent directors by Phase 2

GAAP from Phase 1 · TCFD-aligned · independent board by Phase 2

The town of El Calafate on Lago ArgentinoIllustrative rendering
El Calafate: 80+ direct jobs at 10 MW, 200+ at 50 MW; local procurement and training partnerships with Argentine universities.
Engineers at a wind measurement mast on the Patagonian steppeIllustrative rendering
Phase 0 on site: site survey and wind measurement mast on own land.

Team & governance

Independent, focused team

CFO hired on day 1 for IPO readiness · board and advisors recruited by Phase 1 · core team scales to ~50 FTE at 10 MW

RoleFTETypeCostResponsibility
ML / inference systems eng.1.0New hire$300–420KGLM-5.2 on 8×H200, tensor parallel, OpenAI endpoint
TEE / confidential computing eng.1.0New hire$320–450KH200 CC mode, TDX/SEV-SNP, attestation, sealed-box eval
Eng lead / founder1.0FounderEquityArchitecture, design partners, investors, strategy
CFO / finance lead0.5New hire$250–400KGAAP from day 1, auditor, IPO readiness, IR
Energy project manager0.5Contractor$80–120K28 MW park + 10 MW DC: EIA, EPC, CAMMESA, 132 kV
Enterprise BD / sales0.5New hire$120–180KRegulated pipeline, design-partner LOIs, first 2 signed
Legal / token counsel0.5Contractor$80–150KCorporate structure, utility token, LATAM regulatory

Board & advisors (targets)

AI infra

Independent director

Former hyperscaler infrastructure executive: technical credibility and operations at scale.

Capital

Independent director

Ex-investment banker or CFO with NASDAQ listing experience, for Phase 2 IPO preparation.

Energy

Energy advisor

Argentine or regional renewables expert: Patagonia permits, CAMMESA, grid tie, project finance.

AI / ML

AI / ML advisor

Research-level expertise in TEE/attestation or AI model serving at scale.

Governance: GAAP financials, audit readiness and investor reporting from Phase 1; board and advisors in place ahead of any institutional raise.

Risk matrix

Known risks, each with a concrete mitigation

High

No paying customer yet

Phase 0 gate: energy/DC CAPEX starts only when anchor contracts cover ≥30% of Phase 1. Walk-away cost if Phase 0 fails: ~$4–6M, a cheap option to test the thesis.

High

Capital & execution

Phase 1 = $0.45–0.57B, ~70% debt/GPU-financed against contracted revenue. Modular 5 MW blocks, fixed-price EPC, +15–20% Patagonia logistics premium already modelled.

Med

Well-funded competitors

CoreWeave ($1.1B+) and Nebius (NASDAQ) are real. Our moat is six compounding layers that take 24 months and $130–160M (excl. GPUs) to replicate.

Med

IPO market timing

The IPO is Phase 3+ and optional. EBITDA positive from first nodes; growth paced by contracts and financing. The IPO accelerates 35→50 MW, it is not required.

Med

Open-weight models go closed

The attestation and infrastructure stack is model-agnostic. If DeepSeek disappears we switch models in weeks. Value sits in enclave + jurisdiction + energy cost.

Low

Token regulatory risk

Token sits in a separate entity, structured as utility with specialist counsel from Phase 0. Optional financing: the plan is profitable without token proceeds.

Corporate structure

How the assets fit together

Two entities, one integrated asset stack. Bloovian Inc. owns all hard assets; the foundation manages the token. They are legally separate.

B

Bloovian Inc.

Operating company · owns all hard assets and IP · revenue-generating · the equity investors own

  • Land30,000 ha, El Calafate, Santa Cruz. Zero lease cost. Planning rights.
  • Renewable energyWind + solar + BESS sized to own DC demand. Own substation. No export.
  • Data center10→50 MW IT on own land. Zero DC rent. Own cooling. Own fibre.
  • AI operationsConfidential serving, parity eval, sovereign deployments. $40–90K/node/month.
  • IP stackTEE attestation layer, eval harness, serving orchestration. 18-month head start.
  • Treasury agreementCommercial relationship with the Token Foundation for GPU operator rewards.
T

Bloovian Token Foundation

Separate legal entity · token holders are not equity holders

  • TreasuryFunded by 6–8%/yr token inflation
  • GPU stakingWorker nodes stake to join network
  • Buybacks% of inference revenue routed back
  • GovernanceToken-holder parameter voting
  • EcosystemDeveloper grants, integrations

Investor clarity: buying equity in Bloovian Inc. = owning the land, energy plant, DC, AI revenue and IP. The token is a separate financing instrument. A NASDAQ IPO is equity only.

the campus at night under the Patagonian skyIllustrative rendering

Bloovian Inc.

Sovereign. Renewable. Independent.

The only verifiable, jurisdiction-sovereign, 100%-renewable AI inference platform in Latin America: built on own land, own power and a six-layer structural moat that takes 24+ months and $130–160M (excl. GPUs) to replicate.

  • 75–85%gross margin, own infrastructure
  • $3–5Knode OPEX/month vs $15–22K rented
  • Yr 1EBITDA positive
  • 6 layerscompounding moat
Go to Investor Relations